Get In Touch
Get In Touch +1 (888) 851-3898
The GT 500 Direct Feed is an easy-to-install hanging fan ideal for interior humidification, evaporative cooling, and chemical fogging. Components are UV stabilized and suitable for outdoor use.
This centrifugal atomizer has a rear-feed blade system that produces billions of tiny, fog-like particles that evaporate quickly. A hydrophilic front guard helps keep floors dry. The fogging output is adjustable and controlled by a flowmeter. Units can also be fed using a metering pump or gravity feed system.
The GT 500 Direct Feed comes equipped with 30’ of water line, a garden hose connector, 16’ of drainage line, and the flowmeter panel of your choice. Units hang by either a single U-bolt or a universal mounting bolt.
Features
Flowmeter Control Panel
GT 500 direct feed units come with a flowmeter panel of your choice. These panels control the water flow rate and fogging output. They feature stainless steel construction and a clear polycarbonate flow rate scale for monitoring. Flowmeters require a water supply of 10 to 100 PSI.
The smaller flow rate panels are generally used in applications requiring drier fog.
Jaybird’s Rear-Feed Blade
Our exclusive blade design is a significant product development, enhancing reliability and performance.
ABB Wash-Down-Duty Motor
Hydrophilic Guard
The front guard is designed to meet OSHA fan guard requirements and wick away water.
Overall Dimensions: |
Diameter 21 in / 53.5 cm Depth 17.5 in / 44.5 cm Height 25 in / 63.5 cm |
---|---|
Propulsion Distance: |
25-30 ft / 7.6-9.1 m |
Noise @ 10 ft: | 70 dB(A) |
Average Particle Size: |
5-10 microns @ low volume 30 microns @ high volume |
CFM: | 2,000 |
Operation: | Continuous duty capability |
Energy Consumption: |
1/4 HP - 3.4 amps @ 115V 1/4 HP - 1.8 amps @ 230V 1/5 HP - 2.0 amps @ 240V 50Hz |
Shipping Weight: | 42 lbs / 18.6 kg |
Box Dimensions: |
21' x 21' x 17' 53cm x 53cm x 42cm |
Environment: |
Endures temperatures from 31° to 160° F Indoors / outdoors Humidity to 100% RH UV stabilized & impact resistant |
Order shipment preparation takes 3 days. Once shipped orders usually take 2 weeks to be delivered. These are estimations; delivery can be delayed for reasons beyond our control. You can always contact us to know the exact delivery time once you placed an order with us. Have a look at our shipping policy here.